SAW
HWEI YING
ROJECT 1: SKELETAL CONSTRUCTION (TEMPORARY BUS SHELTER)
In a group of 6, we are required to construct a temporary bus shelter by using recycled materials. We are needed to produce a 1:5 physical model which shows the actual joints used in the design and a report which consists of all the information of our design. This bus shelter will need to accommmodate 5 to 6 users with the maximun height of 3000mm and the maximum base size is 2000mm x 4000mm. In this project, we are asked to differentiate the primary structure and secondary stucture by changing the thickness of used materials. Through this project, I am able to understand the skeletal structure better and analyze the force and stress.
![]() | ![]() | ![]() | ![]() |
|---|---|---|---|
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
![]() | ![]() |


ROJECT 2: UNDERSTAND FORCE IN BUILDING CONSTRUCTION
In a group os 3, we are required to propose a building either with tensile construction or grid shell construction and identify the structural systems used in the construction of the building of our choice. For my group, we chose Savill Building which is a grid shell structure. We are asked to produce study model and 2 A2 board to explain the building selected.


















